Redlands Drilling have been out to this site twice to drill investigation boreholes. The work consisting of shallow auger and wash bore holes to a maximum depth of 15m and the installation of groundwater instruments. The Hydrapower Scout was used as there was some access issues including a borehole located in a creek bed so the 4WD rig was ideal for the job. Redlands drilling completed the works within the allocated time frame and drilled and few extra boreholes for more information which made the client happy.