Projects

Inland Rail

In early 2019 Redlands Drilling was contracted by Golders as one of the many Drilling companies to be part of the Inland Rail project. The Hydrapower Scout and its crew left in early April and completed over 5 months work on the Inland Rail alignment G2K section which reaches from Gowrie just west of Toowoomba to Kagaru just north west of Beaudesert. Over this project Redlands Drilling completed holes to depths of 45m including inclined boreholes which led to the purchase of HQ Wireline Coring equipment. Redlands Drilling performed well in sometimes difficult ground, producing great core recovery with some holes having 100% water loss. Redlands Drilling established a great working relationship with the Golder and ARTC teams out onsite and are hopeful of continuing this on future sections of this project.

Logan Water Alliance

Redlands Drilling have been providing our services to the Logan City Council and Downer Alliance since 2017. We have completed several jobs over the past 2 years ranging from short 1 day jobs to 3 months continuous work on their larger sites. Drilling ranges from shallow auger holes to Nmlc coring holes to depths of 40m and from. The Logan Shire continues to grow rapidly with Redlands Drilling completing works from Beenleigh all the way out to Flagstone in the west. Redlands Drilling has a great working relations with the Alliance and hopes to continue this into the very prosperous future of the Logan Shire.

M1-M3 UPGRADE

Aussie Hydrovac Services engaged the services of Redlands Drilling for the M1-M3 upgrade project. Over the duration of the project Redlands Drilling completed boreholes up to depths of 20m with the installation of groundwater testing instruments in some locations. The job was completed mostly with the Hydrapower Scout with some tight access to boreholes.

UTE RD4

VARSITY LAKES M1 UPGRADE

Working alongside Aussie Hydrovac Services once again Redlands Drilling were contracted in to drill 6 boreholes for an upgrade of the M1 Varsity Lakes intersection. This job insisted of boreholes up to a depth of 35m in some locations. The rock encountered was highly fractured and proved difficult to core resulting in very short runs. Both drill rigs were used

GLADSTONE PORT CALTEX

This job consisted of deep boreholes up to 60m below ground level. Redlands Drilling completed 3 x 60m, 1 x 50m and 1 x 35m boreholes.  With time constraints Redlands Drilling worked 7 days a week to accommodate the client. Some of the ground proved difficult to deal with including large boulders and gravel laying above the rock located around

UNDULLAH DAM AND BRIDGE PROJECT

Redlands Drilling have been out to this site twice to drill investigation boreholes. The work consisting of shallow auger and wash bore holes to a maximum depth of 15m and the installation of groundwater instruments. The Hydrapower Scout was used as there was some access issues including a borehole located in a creek bed so the 4WD rig was ideal

ADANI RAIL LINK PROJECT

Redlands Drilling is excited to announce that they will be undertaking work on the Adani Rail Link Project. This will be the 4th time Redlands Drilling has been engaged to complete works for Adani. Redlands Drilling will be completing one of six packages that will include deep boreholes of depths up to 50m.